Heavy Maintenance Facility
Alaska Airlines, Oakland International Airport
Oakland, CA

Construction Cost: $5 Million

Size: 27,300 SF


This project remodeled 27,300 SF of shop, office, and hangar bay in Hangar No. 6. It enabled the independent movement of two aircraft within the hangar.

Wood Harbinger’s work included the design of the mechanical, fire protection, electrical, and communication systems for the two-position MD-80 hangar bay.

This project included three stages of occupancy, with continuous occupancy of the areas of the facility not under construction. Innovative engineering and phased construction documents were required to facilitate the construction process without interruption of normal administrative and aircraft maintenance operations.