Terrace Park K-8 School

Edmonds School District - Edmonds, WA

Wood Harbinger provided mechanical and electrical commissioning services for the 70,500 SF Terrace Park K-8 School. For the Edmonds School District, we:
  • Monitored construction progress to ensure that systems were installed properly for start-up, testing, and commissioning;
  • Coordinated start-up, balancing, and commissioning schedule with the Contractor;
  • Participated in the functional performance testing and systems operational demonstrations;
  • Inspected electrical panels and their schedules;
  • Tested electrical receptacles for proper wiring;
  • Verified data, lighting, security, intercom, and ground fault systems for proper operation; and
  • Prepared commissioning report summarizing our findings.
More Commissioning Projects.
      Printer Friendly PDF
WOOD HARBINGER, INC. | Mechanical / Electrical Engineers | 3009 112th Avenue NE, Suite 100 | Bellevue, WA  98004 | (425) 822-9499
Copyright 2007   Wood Harbinger, Inc.