Steam-Condensate Utilidor

Washington State Department of Corrections - Shelton, WA

Wood Harbinger designed new steam and condensate piping from the existing steam plant to over 15 buildings, all within the Department of Corrections' perimeter fence.

The piping was routed through at-grade or below-grade utilidors. The piping replaced the existing direct buried steam and condensate piping, while tying into the existing piping within each building. More Industrial Projects. More Utility Systems Projects.
      Printer Friendly PDF
WOOD HARBINGER, INC. | Mechanical / Electrical Engineers | 3009 112th Avenue NE, Suite 100 | Bellevue, WA  98004 | (425) 822-9499
Copyright 2007   Wood Harbinger, Inc.